ST. JOSEPH, Mo. – The following is a listing of general highway maintenance and construction work in the Northwest Missouri region for the week of June 29 – July 5, from the Missouri Department of Transportation. There will be no work during the July 4 holiday, but some closures may remain in place. Many projects will include lane closures, and delays can be expected. MoDOT reminds the public to buckle up, slow down, and drive with extreme caution through work zones.
For more information about a project, please contact MoDOT at 1-888-ASK-MoDOT(888-275-6636) or visit www.modot.org/northwest/. You can also follow MoDOT’s Northwest Missouri District on Twitter @ModotNorthwest and on Facebook atwww.facebook.com/
Andrew County
Interstate 29 – NIGHT WORK from U.S. Route 71 to Route O (Buchanan County); pavement repair, June 29 – July 3, 6 p.m. to 6 a.m. Includes work on the driving lanes and a 15-foot width restriction.
Route Y – CLOSED from County Road 29 to County Road 25; culvert replacement,June 29, 7:30 a.m. to 3:30 p.m.
I-29 – At the Hopkins Creek Bridge; bridge maintenance, June 29 – July 5
Route 71 – From Route B to Route A (Nodaway County); pothole patching, June 29 – 30
U.S. Route 71 – Striping, June 29 to July 2
Route D – CLOSED from one mile north of U.S. Route 169 to County Road 308; culvert replacement, June 30, 8 a.m. to 3:30 p.m.
Atchison County
Route B – Pothole patching, June 29 – 30
Buchanan County
U.S. Route 169 and Route 752 – Sweeping and flushing bridges, June 29 – July 1
I-229 and I-29 – Mowing, June 29 – July 1
Route 371 – From Route DD to Route 116; pothole patching, June 29 – July 1
U.S. Route 36 – Spraying, June 29 to July 2
I-29 – NIGHT WORK from U.S. Route 71 (Andrew County) to Route O; pavement repair, June 29 – July 3, 6 p.m. to 6 a.m. Includes work on the driving lanes and a 15-foot width restriction.
Business Loop 29 – Belt Highway from County Line Road to Ashland Avenue; sidewalk project, June 29 – July 3. Various lanes will be closed at different times, including lanes on side streets.
U.S. Route 59 – At the Bankers Crossing Bridge; new bridge construction, June 29 – July 5
U.S. Route 36 – At the Platte River Bridge; bridge deck replacement, June 29 – July 5. Traffic is head to head in the eastbound lanes with a 14-foot width restriction.
Caldwell County
Route 13 – At the Shoal Creek Bridge; bridge maintenance, June 29, 7 a.m. to 5 p.m.(12-foot width restriction.)
U.S. Route 36 – From Route P to Spring Hill Road; pavement repair, June 29 – 30 (12-foot width restriction.)
U.S. Route 36 – Spraying, June 29 to July 2
Route D – At the Shoal Creek Bridge; bridge maintenance, June 30, 7 a.m. to 5 p.m.(12-foot width restriction.)
Carroll County
Route J – Pothole patching, June 29
Various routes – Sign operations, June 29 – July 2
U.S. Route 65 – At the Route 10 bridge overpass; bridge maintenance, June 29 to July 5 (Temporary traffic signals will be installed.)
Route 139 – Pothole patching, June 30 – July 1
Route D – From U.S. Route 36 (Livingston County) to Route C; pothole patching, June 30 – July 2
Route M – Pothole patching, July 2
Chariton County
Route MM – Pothole patching, June 29 – July 2
Route FF – Pothole patching, June 29 – July 2
Route Y – Pothole patching, June 29 – July 2
Route JJ – CLOSED from Bristol Avenue to Kansas Avenue (Linn County); culvert replacement, June 30, 7 a.m. to 3 p.m.
Clinton County
Route C – CLOSED; culvert replacement, June 29 – July 2
Route Y – Pothole patching, June 29 – July 2
Daviess County
I-35, U.S. Route 69, Routes 6 and 190 – Pothole patching, June 29 – July 2
U.S. Route 69, Routes DD, B and CC – Brush cutting, June 29 – July 2
Route 6 – At the Route MM overpass bridge; bridge maintenance, July 1 – 2 (12-foot width restriction)
Dekalb County
U.S. Route 36 – The westbound driving lane of the U.S. Hwy 36 bridge over I-35; bridge maintenance, June 29 – July 1. (Includes an overnight lane closure and includes a 12-foot width restriction.)
Gentry County
Route H – From Route E to U.S. Route 136; shoulder work, June 29 – 30
Route M – Pothole patching, June 29 – July 2
Grundy County
Route J – CLOSED; resurfacing project, June 29 – July 1
Route BB – CLOSED; resurfacing project, June 30 – July 1
Route W – Pothole patching, June 29 – July 2
Routes W, 6 and 139 – Sign operations, June 29 – July 2
U.S. Route 65 and Route 6 – Spraying, June 29 – July 2
Route U – Pothole patching, June 30 – July 2
Harrison County
Route F – CLOSED at the Little Creek Bridge; bridge replacement. Closed through July 2015.
Route B – Pothole patching, June 29
Route 46 – From Route NN to U.S. Route 69; shoulder work, June 29 – 30
Route ZZ – From Route P to County Road 355; shoulder work, June 30 – July 2
Route H – Pothole patching, June 30
Route 13 – From the Bethany city limits to County Road 340th; pothole patching, July 1
Route T – From Route UU to the Iowa state line; pothole patching, July 2
Holt County
I-29 – CLOSED at U.S. Route 59 (Exit 75); bridge deck replacement. Closed through June 2015. Traffic is being rerouted to the on and off ramps. No access to U.S. Route 59 via Exit 75.
U.S. Route 59 – CLOSED at I-29; bridge deck replacement. Closed through June 2015. No access to I-29.
U.S. Route 59 – From the Oregon city limits to I-29; pavement repair, June 29 – July 2
I-29 – From the Mound City city limits to the Corning city limits; pothole patching, June 29 – July 2
Linn County
Routes JJ and WW – drainage work, June 29 – 30
Routes U, V, 11 and 129 – Pothole patching, June 29 – July 1
Routes U, HH, CC, 11 and 129 – Mowing, June 29 – July 2
Routes Y, DD, B, P and C – Spraying, June 29 – July 2
U.S. Route 36 – Westbound approximately one-quarter mile east of the Route 11 ramp; shoulder work, July 1
Route 129 – CLOSED from Newton Road to Noland Road; culvert replacement, July 1, 7 a.m. to 3 p.m.
Route JJ – CLOSED from Kemper Road to South Fairview Drive; culvert replacement, July 2, 7
Livingston County
Route Z – Pothole patching, June 29
Routes U, A and W – Pothole patching, June 29 – July 2
Routes Y, A, U, N, O and CC – Mowing, June 29 – July 2
Route D – From U.S. Route 36 to Route C (Carroll County); pothole patching, June 30 – July 2
Mercer County
Route J – CLOSED; resurfacing project, June 29 – July 1
Nodaway County
U.S. Route 71 – From Route A to Route B (Andrew County); pothole patching, June 29 – 30
Various routes – Mowing, June 29 – July 2
U.S. Route 71 – Striping, June 29 to July 2
Route NN – At the Platte River Bridge; bridge maintenance, June 29 – July 2 (10 foot width restriction)
Route 148 – Pothole patching, July 1 – 2
Putnam County
Route NN – CLOSED from 135th Road to 120th Road; culvert replacement, June 29, 7:30 a.m. to 2:30 p.m.
Routes FF and 149 – Pothole patching, June 29 – July 3
Route 5 – From U.S. Route 136 to the Iowa state line; drainage and shoulder work,June 30 – July 1
Route F – CLOSED from Route 5 to 290th Road; culvert replacement, July 2, 7:30 a.m. to 2:30 p.m.
Sullivan County
Route WW – CLOSED from Route E to Bear Drive; culvert replacement, June 29, 7 a.m. to 3 p.m.
Route 6 – At the West Yellow Creek; bridge maintenance, June 29 – July 2
Routes H, CC, FF and V – Pothole patching, June 29 – July 2
Route K – CLOSED from Outlook Road to Route BB; culvert replacement, June 30 – July 1, 7 a.m. to 3 p.m. daily
Worth County
Various routes – Mowing, June 29 – July 2
Route U – Pothole patching, June 30 – July 2
Route T – Drainage work, July 1 – 2