Quantcast
Channel: St. Joseph Post
Viewing all articles
Browse latest Browse all 12451

Road Work for Northwest Missouri, April 27 – May 3

$
0
0

MoDOT LogoST. JOSEPH, Mo. – The following is a listing of general highway maintenance and construction work in the Northwest Missouri region for the week of April 27 – May 3 from the Missouri Department of Transportation. Weather conditions may cause postponements in planned work schedules. Other construction or maintenance work may occur on other roadways throughout the area. Many projects will include lane closures and delays can be expected.

For more information about a project, please contact MoDOT at 1-888-ASK-MoDOT(888-275-6636) or visit www.modot.org/northwest/. You can also follow MoDOT’s Northwest Missouri District on Twitter @ModotNorthwest and on Facebook atwww.facebook.com/MoDOTNWDistrict.

Andrew County

Interstate 29 – Northbound from mile marker 60 to mile marker 67 (Holt County); milling and resurfacing, April 27 – May 2. Includes work on the driving lanes, entrance and exit ramps and a 16-foot width restriction.

I-29 – Southbound at the Hopkins Creek Bridge; bridge maintenance, April 27 – May 1(14-foot width restriction)

Various routes – Striping, April 28 – 30

Atchison County

I-29 – Sweeping and flushing bridges, April 27 – 30

U.S. Hwy 59 – Shoulder work, April 27 – 30

Route B – Pothole patching, April 27 – May 1

U.S. Hwy 136 – Sign operations, April 27 – May 1

Buchanan County

U.S. Hwy 36, I-29 and I-229 – Sweeping and flushing bridges, April 27 – 30

Loop 29 – Belt Highway from County Line Road to Ashland Avenue; sidewalk project,April 27 – May 1. Various lanes will be closed at different times, including lanes on side streets.

I-229 – From just after the St. Joseph Avenue on ramp to just before U.S. Hwy 36; bridge maintenance, April 27 – May 1. (10-foot width restriction)

U.S. Hwy 59 – At the Bankers Crossing Bridge; new bridge construction, April 27 – May 1

U.S. Hwy 371 – From Route H to one-quarter mile south of Route H; guardrail repair,April 27 – May 1

U.S. Hwy 36 – At the Platte River Bridge; bridge deck replacement, April 27 – May 1. Traffic is head to head in the eastbound lanes with a 14-foot width restriction.

Various routes – Spraying, April 27 – May 1

Caldwell County

Various routes – Spraying and brush chipping, April 27 – May 1

U.S. Hwy 36 – From Route J to Route N (DeKalb County); bridge maintenance, April 27 – May 1

Carroll County

U.S. Hwy 24 – From Route B to Route 41; drainage work, April 27 – May 1

Routes M and YY – Approach repairs, April 27 – May 1

Routes T, U and Z – Sign operations; April 27 – May 1

Routes J and W – Litter pick up; April 27 – May 1

Chariton County

U.S. Hwy 24 – In the Salisbury city limits at 2nd Street; drainage work, April 27 – 30

U.S. Hwy 24 and Route 5 – Spraying and litter pick up; April 27 – 30

Route 5 – From U.S. Hwy 24 to Bridge Street; drainage work, April 27 – 30

Clinton County

Route NN – From Route 33 to Braley Road; culvert repair, April 28 – 30. Signals will guide motorists through the work zone.

Daviess County

I-35, U.S. Hwy 69 and Routes 6 and 190 – Pothole patching, April 27 – May 1

Route 13 – Within the Gallatin city limits; drainage work, April 27 – May 1

I-35 – From U.S. Hwy 69 to Route H; litter pick up, April 27 – May 1

Various routes – Spraying, April 27 – May 1

DeKalb County

U.S. Hwy 36 – The westbound driving lane of the bridge over I-35; bridge maintenance, April 27 – May 1. The work zone will be left up overnight and includes a 12-foot width restriction.

U.S. Hwy 36 – Eastbound from Route 31 to I-35; pavement repair, April 27 – May 1. (12-foot width restriction)

U.S. Hwy 36 – From Route N to Route J (Caldwell County); bridge maintenance, April 27 – May 1

U.S.  Hwy 36 – Median work, April 28 – May 1

Gentry County

Route M – CLOSED from the Nodaway Gentry Road to 425th Road; culvert replacement, April 27 – 28, 8 a.m. to 2:30 p.m. daily

Routes M and UU – Pothole patching, April 27 – May 1

U.S. Hwy 136 – One-half mile east of the Route 85 and C intersection; culvert repair, April 28

Route 85 – Three-quarters of a mile north of Route P; culvert repair, April 29

Route H – CLOSED from 410th Street to 415th Road; culvert replacement, April 29, 8 a.m. to 2:30 p.m.

U.S. Hwys 136 and 169 – In the city limits of Stanberry; drainage work, April 29 – May 1

Grundy County

Route K – Culvert repair, April 27

Route 6 and U.S. Hwy 65 – Sweeping and flushing bridges and litter pick up, April 27 – May 1

Routes J, N and NN – Drainage work, April 27 – May 1

Routes 146, 190, W and WW – Shoulder work, April 27 – May 1

Routes 190, F, W and WW – Sign operations, April 27 – May 1

Harrison County

Route F – CLOSED at the Little Creek Bridge; bridge replacement.  Closed through July 2015.

Route H – From Route 146 to 260th Avenue; sealing, April 27 – 30

Various routes – Spraying, April 27 – May 1

Holt County

U.S. Hwy 59 – CLOSED at the Squaw Creek Bridge; bridge deck replacement.  Closed through May 2015.

I-29 – Northbound lanes closed at U.S. Hwy 59 (Exit 75); bridge deck replacement. Closed through June 2015. Traffic is being rerouted to the on and off ramps. No access to U.S. Hwy 59 via Exit 75.

U.S. Hwy 59 – CLOSED at I-29, bridge deck replacement. Closed through June 2015. No access to northbound I-29.

Various routes – Striping, April 27

I-29 – From Mound City to the Andrew County line; sweeping and flushing bridges,April 27 – May 1

Route 113 – Drainage work, April 27 – May 1

I-29 – Northbound from mile marker 60 (Andrew County) to mile marker 67; milling and resurfacing, April 27 – May 1. Includes work on the driving lanes, entrance and exit ramps and a 16-foot width restriction.

Linn County

U.S. Hwy 36 – Pothole patching, April 27

U.S. Hwy 36 – Eastbound at the Mussell Fork Bridge; bridge maintenance, April 28 – 29

Route EE – Culvert repair, April 29 – 30

Routes 139, 130, 129, B, U and YY – Pothole patching, April 29 – May 1

Routes 139, E, JJ, WW, YY and ZZ – Spraying, April 29 – May 1

Livingston County

U.S. Hwy 65 – From Route 190 to Route K; brush cutting, April 27 – May 1

Route V – From Route K to the city limits of Chillicothe; pothole patching, April 27 – May 1

Route K – Culvert repair, April 28

Route Z – Culvert repair, May 1

Mercer County

U.S. Hwy 136 – At the West Muddy Creek Bridge; bridge maintenance, April 27 – May 1

U.S. Hwys 136, 65 and Route B – Pothole patching and litter pick up, April 27 – May 1

Routes P and DD – Drainage work, April 27 – May 1

Nodaway County

U.S. Hwy 71 – From the city limits of Clearmont to Route FF; shoulder work, April 27 – May 1

Route 46 – From U.S. Hwy 136 to Route NN; pothole patching, April 27 – May 1

U.S. Hwy 71, 136 and Route M – Bridge piling painting and sweeping and flushing bridges, April 27 – May 1

Route M – From U.S. Hwy 71 to Route AH; pothole patching, April 27 – May 1

Putnam County

Route E – CLOSED at the Medicine Creek Bridge; bridge replacement.  Closed through May 2015.

U.S. Hwy 136 – CLOSED at the Shoal Creek Bridge; bridge replacement.  Closed through May 2015.

Route W – Drainage work, April 27 – 28

Routes 149, V, W and FF – Pothole patching, April 27 – May 1

Route 5 – Drainage work, April 29 – 30

Routes 5, UU, Y and YY – Sign operations, April 29 – May 1

Sullivan County

Routes 5, 6, P, E and K – Pothole patching, April 27 – May 1

Routes D, MM and Z – Driveway entrance repairs, April 27 – May 1

Worth County

Routes T and Y – Drainage work, April 27 – 30.

Route 46 – From the Worth County line to U.S. Hwy 69; drainage work, April 28 – May 1


Viewing all articles
Browse latest Browse all 12451

Trending Articles